ASEAN Bridge
NBI
Structurae ID
Global Region
Asia
Country
Malaysia
State/Province
Sarawak
City
Miri Division
Crossing
Baram River
Lat/Lon
4.56306/114.07361
Construction
2000 - 2003
Age
20
Design life
Designer/Cosultant
Total Length
1500
Maximum Span
400
Usage
Road
Health
Good
Cable
Prestressed Concrete
Deck
Prestressed Concrete
Pier
Reinforced Concrete
Reconstruction
No
Year Reconstructed
Modifications
No
Monitoring
No
Notes