Chicago Skyway High Bridge

NBI
016641900000000
Structurae ID
20011564
Global Region
North America
Country
United States
State/Province
Illinois
City
Chicago
Crossing
Calumet River
Lat/Lon
41.71763/-87.54256
Construction
1956 - 1958
Age
65
Design life
Designer/Cosultant
Total Length
749
Maximum Span
198
Usage
Road
Health
Good
Cable
Steel
Deck
Steel
Pier
Steel
Reconstruction
Yes
Year Reconstructed
2003
Modifications
No
Monitoring
No
Notes
Year reconstructed: 2003. Recommended work: Widening of existing bridge with deck rehabilitation or replacement. Estimated cost of work: $8,565,000