Daniel Carter Beard Bridge Southbound

NBI
019B00039L(R)
Structurae ID
20005007
Global Region
North America
Country
United States
State/Province
Ohio
City
Cincinnati
Crossing
Ohio River
Lat/Lon
39.09944/-84.49278
Construction
1976 - 1977
Age
46
Design life
Designer/Cosultant
Total Length
639
Maximum Span
230
Usage
Road
Health
Obsolete
Cable
Steel
Deck
Steel
Pier
Reinforced Concrete
Reconstruction
Yes
Year Reconstructed
2000
Modifications
Yes
Monitoring
No
Notes
2000 widened from 3 to 4 lanes. Recommended work: Widening of existing bridge with deck rehabilitation or replacement. Estimated cost of work: $8,661,000