Kizuna Bridge
NBI
Structurae ID
20004657
Global Region
Asia
Country
Cambodia
State/Province
Kampong Cham district
City
Kampong Cham
Crossing
Mekong River
Lat/Lon
12.00000/105.45000
Construction
1999 - 2001
Age
22
Design life
Designer/Cosultant
Total Length
1500
Maximum Span
170
Usage
Foot/Bicycle, Road
Health
Good
Cable
Prestressed Concrete
Deck
Prestressed Concrete
Pier
Reinforced Concrete
Reconstruction
No
Year Reconstructed
Modifications
No
Monitoring
No
Notes