Market Street Bridge (Ohio River)
NBI
00000000005A006
Structurae ID
20009566
Global Region
North America
Country
United States
State/Province
Ohio
City
Steubenville
Crossing
Ohio River
Lat/Lon
40.35778/-80.60806
Construction
1902 - 1905
Age
118
Design life
Designer/Cosultant
Total Length
547
Maximum Span
210
Usage
Foot/Bicycle, Road
Health
Good
Cable
Steel
Deck
Steel
Pier
Steel
Reconstruction
Yes
Year Reconstructed
1981
Modifications
No
Monitoring
No
Notes
STRENGTHENING (1922) Recommended work: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. Estimated cost of work: $102,000