Murray Baker Bridge
NBI
090000100000000
Structurae ID
Global Region
North America
Country
United States
State/Province
Illinois
City
Peoria
Crossing
Illinois River
Lat/Lon
40.68778/-89.58333
Construction
1956 - 1958
Age
65
Design life
Designer/Cosultant
Total Length
980
Maximum Span
182
Usage
Road
Health
Deficient
Cable
Steel
Deck
Steel
Pier
Reinforced Concrete
Reconstruction
Yes
Year Reconstructed
2005
Modifications
No
Monitoring
No
Notes
Year reconstructed: 2005. Recommended work: Other structural work, including hydraulic replacements. Estimated cost of work: $4,679,000