Roosevelt Lake Bridge

NBI
02028
Structurae ID
20000538
Global Region
North America
Country
United States
State/Province
Arizona
City
Roosevelt
Crossing
Roosevelt Lake
Lat/Lon
33.67389/-111.15697
Construction
1990 - 1992
Age
31
Design life
Designer/Cosultant
Total Length
670
Maximum Span
329
Usage
Foot/Bicycle, Road
Health
Good
Cable
Steel
Deck
Steel
Pier
Reinforced Concrete
Reconstruction
No
Year Reconstructed
Modifications
No
Monitoring
No
Notes
Recommended work: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. Estimated cost of work: $7,530,000