Southway bridge Idaho

NBI
000000000021495
Structurae ID
Global Region
North America
Country
United States
State/Province
Idaho
City
Nez Perce County
Crossing
Snake River
Lat/Lon
46.39567/-117.04069
Construction
1981 - 1982
Age
41
Design life
Designer/Cosultant
Total Length
568
Maximum Span
185
Usage
Foot/Bicycle, Road
Health
Deficient
Cable
Prestressed Concrete
Deck
Prestressed Concrete
Pier
Reinforced Concrete
Reconstruction
Yes
Year Reconstructed
Modifications
No
Monitoring
No
Notes
Recommended work: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. Estimated cost of work: $28,634,000