Talmadge Memorial Bridge
NBI
000000005101690
Structurae ID
20000537
Global Region
North America
Country
United States
State/Province
Georgia
City
Savannah
Crossing
Savannah River
Lat/Lon
32.08908/-81.09880
Construction
1987 - 1991
Age
32
Design life
Designer/Cosultant
Total Length
2698
Maximum Span
335
Usage
Road
Health
Good
Cable
Steel
Deck
Steel
Pier
Reinforced Concrete
Reconstruction
No
Year Reconstructed
Modifications
No
Monitoring
No
Notes
Estimated cost of work: $80,178,000