Tobin Memorial Bridge
NBI
B160174X4DOTNBI
Structurae ID
20009330
Global Region
North America
Country
United States
State/Province
Massachusetts
City
Boston
Crossing
Mystic River
Lat/Lon
42.38483/-71.04755
Construction
1948 - 1950
Age
73
Design life
Designer/Cosultant
Total Length
3628
Maximum Span
243
Usage
Road
Health
Obsolete
Cable
Steel
Deck
Steel
Pier
Reinforced Concrete
Reconstruction
Yes
Year Reconstructed
Modifications
No
Monitoring
No
Notes
Recommended work: Bridge rehabilitation because of general structure deterioration or inadequate strength. Estimated cost of work: $33,247,000