Tonton-Nipah Bridge
NBI
Structurae ID
20004149
Global Region
Asia
Country
Indonesia
State/Province
Riau Islands
City
Tonton
Crossing
South China Sea
Lat/Lon
0.97639/104.04928
Construction
1995 - 1997
Age
26
Design life
Designer/Cosultant
Total Length
420
Maximum Span
160
Usage
Foot/Bicycle, Road
Health
Good
Cable
Prestressed Concrete
Deck
Prestressed Concrete
Pier
Reinforced Concrete
Reconstruction
No
Year Reconstructed
Modifications
No
Monitoring
No
Notes